The work behind the walls.
Demolition, plumbing, electrical work and preparation all matter. A good finish starts before the tiles go on.
A better bathroom starts with a clearer budget. Explore your options and get an indicative price range in under a minute.
Estimate my bathroom ↗No sign-up. No sales form. Prices include GST.
Start with what you know. Change your selections to see how the budget moves.
Demolition, plumbing, electrical work and preparation all matter. A good finish starts before the tiles go on.
Shower construction, tapware, tiles and cabinetry shape the budget. Premium products and detailed finishes add time and cost.
Moving drains, working through concrete or repairing water damage can make two similar bathrooms cost very different amounts.
Understand the decisions that matter before you commit to your renovation.
There is no single price that fits every bathroom. Replacing fittings in the same positions usually involves less work than a full strip-out with a tiled shower and a new layout. Use the estimator above for an indicative range, then arrange a site visit for a quote based on your actual room.
A refresh replaces selected fittings while retaining much of the existing room and finishes. A full renovation removes the old bathroom and rebuilds it, allowing for preparation, waterproofing, finishes and the selected fittings. Existing problems may make a refresh unsuitable.
A tiled shower involves more preparation, waterproofing, tiling and detailing than a typical acrylic unit. Glass, drainage design, niches and tile choices can add to the labour and materials.
Often, yes. Keeping the toilet, shower and vanity in their existing positions can reduce drainage and pipework changes. Your contractor still needs to check the condition and suitability of the existing services.
Yes. All amounts shown by this calculator are in New Zealand dollars and include GST. They are indicative planning allowances, not a fixed-price quotation.
A straightforward full renovation may be planned around two to three weeks on site. Scope, drying times, trade scheduling, product availability and any unexpected repairs affect the actual programme. Agree the timing with your contractor before work begins.
Hidden damage can require additional work. Ask your contractor to document the issue, explain the repair and provide the cost and timing impact before you agree to a variation.
Arrange a site visit and agree on the scope, fixture selections and any exclusions. In Hamilton and Waikato, you can contact CTSWaikato on 0800 872 673 or visit ctswaikato.co.nz.
Talk through your project with CTSWaikato in Hamilton and Waikato.